MiningMath

MiningMath

Loading...

A unique approach to maximizing NPV

DoclyChild

Sum

Estimated reading: 2 minutes 913 views

What is a Sum constraint?

Sum constraints are based on the sum of any quantifiable parameter modeled block by block. To use this feature on MiningMath, the dataset must contain an auxiliary field/column which considers a value of what you wish to limit regarding the value of it in each block. Therefore, this feature controls the total amount of the variable that has been modeled based on blocks that were mined in that single period. Basically, any variable which could be modeled considering these assumptions could be controlled.

Video 1: Blending and other constraints.

Some examples are listed below:

  • Tonnages and proportions of rock type and metal production.

  • Consumption of inputs such as energy spent during comminution, and fleet hours spent to mobilize material.

  • Contaminants control on the processing plant during each period.

The user can define:

  • Different sum limits for each material.

  • Different sum limits for each intervals.

  • Different sum limits for each destinations.

  • Combine all the options above in order to achieve globally optimized results.

  1. Create auxiliary fields in the block model, quantifying the information to be controlled (Figure 1).

  2. During importation, assign these auxiliary columns to Other (Figure 2).

  3. On the Other tab, input minimum and maximum limits for each variable, period range and destination (Figure 3).

Share this Doc
CONTENTS

Reblocking

Reblocking is a method used to decrease the number of blocks in a block model by...

Floating-point numbers

Same scenario, different results? Is it possible to find different results for t...

Translations

MiningMath supports and encourages the translation of its knowledge base to mult...

Imperial System

For importing databases, MiningMath uses the metric system exclusively. In case ...

In-Depth MiningMath

This tutorial provides a detailed guidance to the pages in the knowledge base fo...

Theory Validation

MiningMath’s results are only possible due to its proprietary Math Program...

Guaranteed Solutions

Multiple, complex constraints increase the likelihood of not finding or not exis...

MiningMath Uniqueness

MiningMath allows mining managers to improve their strategic analysis through ri...

Time Limit

It is possible to indicate a time limit in hours before running a scenario in th...

Must-Read Articles

In order to take the maximum of MiningMath’s Optimization we recommend this fl...

Tutorials

Geometry

Chat Icon Close Icon